01
Training
Include model size, GPU memory, whether training runs on one node or several, and any interconnect requirements.
Procurement / Compute Hardware
We sell and source hardware for overseas deployments. Share the workload, quantity and delivery city for a system recommendation and itemized quote, with the scope for delivery, installation and acceptance.
Prepare an inquiry email01 / HARDWARE
01
Include model size, GPU memory, whether training runs on one node or several, and any interconnect requirements.
02
Include peak concurrency, latency targets, and the planned system count alongside the GPU requirements.
03
List processor, memory, and local storage needs, along with the delivery city and site conditions.
Networking, storage, and site infrastructure inform equipment selection. The project quote lists the equipment and services included.
02 / HARDWARE
Check the bill of materials (BOM) by system model and quantity. Review GPUs and GPU memory, processors, system memory, storage, network adapters, key part numbers, and any rail, power, and cooling requirements. Record the condition, such as new, used, or refurbished, and identify who provides the warranty and what it covers.
List configuration options, alternative parts, and excluded services separately. Agree on the BOM version before ordering. Before substituting a part, confirm the change in writing, including its implications for compatibility, performance targets, and warranty coverage.
Use the RFQ and acceptance form03 / HARDWARE
01
Check quantities, the condition of the packaging, and verifiable serial numbers against the packing list. Record and report any discrepancies as agreed.
02
Before installation, check racks, rails, load limits, power, cooling, and networking. Confirm who will rack the systems, power them on, and assist on site.
03
Use the contract to verify the delivered configuration, component detection, and hardware health. For any agreed sample workload, record test conditions, results, and deviations.
04 / HARDWARE
01
Keep photos and carrier handover records with the packing list. Check the project terms for packaging retention and the deadline for reporting damage.
02
Before adding parts, confirm who covers the system and the new components under warranty, whether approval is needed, and who will do the installation.
03
Get a repair return reference before shipping. Confirm what to send back, how to pack it, what to do with data drives, and who pays for freight.
05 / HARDWARE
Use the actual shipping route and destination city to confirm the shipping method, who handles customs clearance, who receives the goods, and where handover takes place. Check warranty service locations, repair routes, on-site commissioning, and any help needed from the data center separately for each project.
Before ordering, record what the quote includes, what needs a separate arrangement, and who does and signs off on the work at each milestone.
INQUIRIES
Start with the deployment location, workload and target dates.